- Data
- Money
- Product
- Regulation & influence
- 1Data
Gap in the portfolio
Product planning spots a segment to enter or a model to replace and proposes a business case: volume, price, cost target, and platform.
- 2Money
Board approves the program
The board, answering to anchor shareholders and investors, approves capital for the program, often billions for a new platform.
- 3Data
Design competition
In-house and outside studios sketch competing proposals; the winners become full-size clay and digital models until design freeze.
- 4Data
Engineering in simulation
Engineers model every part in CAD and PLM systems and run crash, aero, and durability simulations long before hardware exists.
- 5Money
Work packages outsourced
Engineering service firms take on whole systems, derivatives, or testing to absorb peaks in workload.
- 6Data
Software and E/E integrated
The vehicle OS, apps, and ADAS functions are developed with software and autonomy partners and integrated on the E/E architecture.
- 7Money
Suppliers nominated
Purchasing nominates Tier 1s for each system (seats, brakes, electronics) for the life of the model.
- 8Product
Tools and lines built
Dies, molds, and fixtures are built and robots installed; pilot builds shake out the processes.
- 9Regulation & influence
Validation and homologation
Prototypes are crashed and driven in heat and cold; technical services test the car and authorities grant type approval.
- 10Product
Start of production
The plant ramps from a few cars a shift to full line speed while launch teams fix early quality issues.
Pulse
Every headline, story, and sentiment shift about follow a new model from sketch to sop: updated continuously, tagged to the map, and linked back to how it works.