Production parts supply agreement (nomination and purchase terms)

The supply of a production part or system for the life of a vehicle program, typically built from a nomination (sourcing) letter, the OEM's general terms and conditions, a scheduling agreement or blanket purchase order, and supplier manuals.

.md
Between
Tier 1 suppliersOEMs (automakers)
Typical term The life of the vehicle program, commonly five to seven years of production plus a long service-parts tail.
The relationship it governs →
01

Key terms, explained

Nomination letter
The OEM's award of a part to a supplier for a program, stating price, volumes, and timing assumptions.
Life-of-program requirements
The supplier must supply the OEM's requirements for the program's life; forecast volumes are usually estimates, not guarantees.
Piece price
Price per part, often with separate amortization of tooling and engineering.
Annual price reductions
Productivity give-backs each year, commonly low single-digit percentages; varies by OEM and part.
Raw material indexation
Formulas that pass changes in steel, aluminum, copper, or resin prices through to the piece price.
Tooling ownership
Customer-owned tooling paid by the OEM but held at the supplier, with rules on maintenance and return.
Payment terms
Days to pay invoices, commonly 45 to 90 days depending on country and OEM.
Warranty and recall cost sharing
Supplier liability for field failures, often allocated by root-cause analysis.
Engineering changes
How design changes are requested, priced, and approved.
Capacity and flexibility
Required ability to produce above forecast, often a set percentage.
Service parts obligation
Duty to supply replacement parts for years after production ends, commonly 10 to 15 years.
Termination and resourcing
OEM rights to end the supply or move it to another supplier, and the compensation owed.
02

How the money works

Price is set in competitive quoting (RFQ) and then adjusted: annual reductions downward, indexation up or down with raw materials, and negotiated recoveries for inflation, volume shortfalls, or engineering changes. Tooling is paid upfront or amortized in the piece price. After 2021, many suppliers won compensation for volume shortfalls and energy and labor inflation.

03

How it differs by country

United States

Governed by UCC Article 2 and state contract law; OEM terms favor requirements contracts that courts have scrutinized for whether a fixed quantity exists. USMCA rules of origin (75% regional value content for core parts and cars) shape sourcing.

Germany

Standard terms are subject to the Civil Code's control of general terms (sections 305 to 310 BGB), which can invalidate unreasonably one-sided clauses even between businesses.

Japan

The Subcontract Act, renamed and strengthened from January 2026 as the Act on Fair Transactions for Small and Medium Subcontractors, bars buyers from setting prices unilaterally without consultation and from paying by promissory note.

South Korea

The Fair Transactions in Subcontracting Act includes a supply price indexation system (2023) that requires linking prices to key raw material costs for covered contracts.

China

Revised Regulations on Ensuring Payment to SMEs (effective June 2025) require large firms to pay SMEs within 60 days; major carmakers publicly pledged 60-day payment terms in June 2025.

European Union

The Late Payment Directive 2011/7/EU sets 60 days as the default maximum for business payments unless expressly agreed and not grossly unfair.

India

The MSMED Act 2006 requires payment to registered micro and small enterprises within 45 days, reinforced by a 2024 tax rule disallowing deductions for late payments.

Mexico

Suppliers serving the US must meet USMCA origin and labor-value rules; contracts often allocate duty risk after 2025 US tariffs.

04

In detail

A supply relationship is a stack of documents, not one contract.

Consensus Link
Supply agreement
Nomination letter
OEM general terms
Purchase order or schedule
Quality and logistics manuals
Tooling agreement
The documents that make up a production supply contract.

Piece price moves over a program's life.

Consensus Link
  1. 1Quoted in RFQ
  2. 2Annual price-downs
  3. 3Material indexation
  4. 4Inflation or volume claims
  5. 5Engineering change pricing
What changes a part's price after award.

OEMs write the standard terms, but single-source and scarce parts give suppliers leverage, as shown by supply stoppages during price disputes.

Consensus Link
OEM
Their levers
  • Writes the terms
  • Resourcing threat
  • Future business awards
Tier 1
Their levers
  • Single-source parts
  • Tooling in its plant
  • Line-stop risk
VS
Leverage in supply agreements.

Payment terms are now regulated in several major markets.[1][2]

Inferred Link
China
60-day SME payment rule
European Union
60-day default
India
45 days for MSMEs
Japan
Subcontract law tightened 2026
Relative weight by region
Rules on paying suppliers (relative, judgment).
Footnotes

Sources

  1. 1Directive 2011/7/EU on combating late payment in commercial transactions , EUR-Lex