Why car companies are switching to Tesla chargers, and do automakers own charging networks?

Automakers need public charging so people will buy EVs, so they build it (Tesla Superchargers, Mercedes-Benz's high-power network, NIO swap stations), co-own it (IONITY in Europe, IONNA in North America), fund it (Volkswagen's Electrify America came from its diesel settlement), or buy access to others' networks, paying for free-charging offers for their buyers. In North America nearly every automaker agreed in 2023 and 2024 to adopt Tesla's plug, standardised as SAE J3400 (NACS), and to give owners Supercharger access.

.md
Fig. What flows between them
  1. OEMs (automakers)
    ↓ Equity, network funding, and prepaid charging
    EV charging networks
  2. ↓ Charging access for the automaker's drivers
    OEMs (automakers)
  3. ↓ Vehicle integration, Plug & Charge certificates
    EV charging networks
  4. ↓ Charger locations, status, and session data
    OEMs (automakers)
The questions people ask

Quick answers

Why are car companies switching to Tesla chargers?

Tesla's Supercharger network was the largest and most reliable fast-charging network in North America. After Ford signed up in May 2023 and GM in June 2023, most automakers agreed to adopt Tesla's connector and give their drivers Supercharger access, often with adapters for older cars.

What is NACS?

NACS, the North American Charging Standard, is Tesla's charging connector, which Tesla opened to other companies in 2022. SAE International standardised it as SAE J3400, and new EVs from most automakers sold in North America are moving to it.

Do car companies own charging networks?

Some do. Tesla owns the Supercharger network, Mercedes-Benz is building its own high-power network, and NIO runs battery-swap stations in China; groups of automakers co-own IONITY in Europe and IONNA in North America.

How do automakers offer free charging?

The automaker prepays or reimburses a charging network for sessions used by its customers, usually for a set period or amount, and activates it through the car's app. Hyundai, for example, bundled free Electrify America sessions with early Ioniq 5 sales in the US.

What is IONNA?

IONNA is a North American fast-charging joint venture announced in 2023 by BMW, General Motors, Honda, Hyundai, Kia, Mercedes-Benz, and Stellantis, later joined by Toyota, aiming for at least 30,000 high-power chargers by 2030.

What is IONITY?

IONITY is a European high-power charging network founded in 2017 by BMW, Daimler, Ford, and the Volkswagen Group, with Hyundai Motor Group joining in 2019. It runs charging hubs along major motorways.

Why does Electrify America exist?

Volkswagen agreed in its 2016 US diesel emissions settlement to invest $2 billion over 10 years in zero-emission vehicle infrastructure and awareness, and created Electrify America to do it.

01

How the relationship works#

01.1

Automakers and charging networks are mutually dependent: networks need EVs on the road, automakers need chargers to sell EVs. Automakers respond by owning, co-owning, funding, or partnering with networks, and by integrating charging into the car's navigation and app.[1][2][3]

Consensus Link
  1. Automaker
    ↓ equity, prepaid sessions
    Charging network
  2. ↓ fast charging
    EV driver
  3. ↓ per-kWh payment
    Charging network
  4. Automaker
    ↓ Plug & Charge, routing
    Charging network
  5. Utility
    ↓ electricity
    Charging network
How automakers, charging networks, and drivers connect.
01.2

Four models coexist: own the network (Tesla, Mercedes-Benz, NIO), joint venture (IONITY, IONNA), settlement or subsidiary funding (Electrify America), and access deals (paying networks such as Tesla, ChargePoint, EVgo, Shell Recharge, or BP Pulse for roaming and free sessions).[4][5][6]

Consensus Link
Own network
  • 1Tesla Superchargers
  • 2Mercedes-Benz HPC
  • 3NIO swap stations
  • 1IONITY (Europe)
  • 2IONNA (North America)
Funded subsidiary
  • 1Electrify America
  • 2VW diesel settlement
  • 1Supercharger access
  • 2Roaming, free sessions
Four ways automakers get charging for their drivers.
02

What flows between them#

02.1

Money flows from automaker to network as equity, prepaid sessions, and integration fees; charging access flows back to the automaker's drivers; data flows both ways: the automaker supplies Plug & Charge certificates and car integration, the network supplies live charger status for in-car navigation.

Consensus Link
  1. Automaker
    ↓ equity, session credits
    Charging network
  2. ↓ access for drivers
    Automaker
  3. ↓ certificates, vehicle data
    Charging network
  4. ↓ charger status
    Automaker
  5. Roaming hub
    ↓ multi-network access
    Automaker
What flows between automakers and charging networks.
02.2

The connector war ended quickly in North America. Tesla opened its connector design in late 2022, Ford announced Supercharger access and the switch in May 2023, GM followed in June 2023, most other automakers within months, and SAE published the connector as J3400.[7][3]

Consensus Link
  1. 1
    Tesla opens connector
    November 2022
  2. 2
    Ford signs on
    May 2023
  3. 3
    GM signs on
    June 2023
  4. 4
    Most automakers follow
    2023 to 2024
  5. 5
    SAE J3400 standard
    SAE International
  6. 6
    Native ports on new EVs
    From 2025 models
How North America moved to Tesla's charging connector.
03

Commercial structure#

03.1

Automakers spend on charging in several ways: equity in joint ventures, capital for owned networks, prepaid charging bundled with car sales, adapter and integration costs, and fees for roaming platforms such as Hubject. Networks earn from per-kWh or per-minute charging, subscriptions, and these automaker deals.[8]

Consensus Link
Automaker charging spend
  • JV equityIONITY, IONNA
  • Owned networksTesla, Mercedes-Benz
  • Prepaid sessionsFree charging offers
  • AdaptersNACS transition
  • Roaming feesHubject, others
Where automaker money goes in charging.
03.2

IONNA shows how rivals pool capital. Announced in July 2023 by BMW, GM, Honda, Hyundai, Kia, Mercedes-Benz, and Stellantis, joined by Toyota, it aims for at least 30,000 high-power chargers in North America by 2030, offering both NACS and CCS plugs.[2]

Consensus Link
IONNA joint venture
BMW
General Motors
Honda
Hyundai and Kia
Mercedes-Benz
Stellantis
Toyota
Joined later
IONNA's automaker shareholders.
03.3

Agreements cover access rights and pricing for the automaker's drivers, free-session reimbursements, Plug & Charge certificate handling (ISO 15118), data sharing on sessions and charger status, uptime commitments, and branding in the car's app.

Inferred Link
1
Access and pricing
Member rates
2
Session credits
Prepaid, reconciled
3
Plug & Charge
ISO 15118 certificates
4
Data sharing
Status, sessions
5
Uptime
Reliability targets
6
Branding
In-app placement
Key terms in automaker charging agreements.
04

How they communicate#

04.1

Bringing a network into a car takes technical integration: compatibility testing at chargers, Plug & Charge certificate setup, live data in the car's navigation and app, billing links, and joint launches.

Consensus Link
  1. 1
    Commercial agreement
    Both
  2. 2
    Compatibility testing
    Engineers
    Cars at chargers
  3. 3
    Plug & Charge setup
    Certificate providers
  4. 4
    App and navigation data
    Automaker software team
  5. 5
    Billing integration
    Both
  6. 6
    Launch to owners
    Marketing
How an automaker integrates a charging network.
04.2

Automakers run charging and energy services teams; networks have OEM partnership managers. Standards bodies (SAE, CharIN) and roaming hubs are where both sides meet engineers from rivals.

Consensus Link
  1. ↓ status data, roadmaps
    Automaker charging team
  2. Standards bodies
    ↓ connector standards
    Automaker charging team
  3. Standards bodies
    ↓ protocol standards
    Network OEM partnerships
Who works on automaker charging partnerships.
05

Power dynamic#

05.1

Tesla holds unusual leverage as both an automaker and the leading network, earning fees from rivals' drivers. Other automakers' leverage comes from pooled capital (IONNA, IONITY), millions of EVs steering drivers to partners, and public funding rules that favour open, interoperable networks.

Consensus Link
Automakers
Their levers
  • Drivers and routing
  • Pooled JV capital
  • Prepaid session volume
  • Standards influence
Charging networks
Their levers
  • Prime sites and grid connections
  • Reliability lead (Tesla)
  • Multi-brand customers
  • Public subsidy access
VS
Automaker scale versus network ownership.
06

Friction & conflict#

06.1

Fights focus on reliability (broken chargers hurt EV sales), pricing for non-member drivers, adapter and compatibility problems during the NACS shift, data ownership, and slow buildout of joint ventures.

Consensus Link
1
Reliability
Broken chargers
2
Pricing
Non-member rates
3
Compatibility
Adapters, cable reach
4
Data
Who owns sessions
5
Buildout pace
Permits, grid delays
Where automakers and charging networks clash.
06.2

Public money moves the market: the US NEVI program set aside $5 billion for highway charging under the 2021 infrastructure law but faced a federal freeze and litigation in 2025, while the EU's AFIR regulation requires fast-charging pools every 60 km on core roads by end-2025.[9][10]

Consensus Link
  1. 1Public funding rules
  2. 2Open-access requirements
  3. 3Networks bid for sites
  4. 4Automakers align plugs
  5. 5Coverage grows unevenly
How public charging policy shapes automaker-network deals.
07

Regional variations#

07.1

In North America, NACS, Tesla access, and IONNA define the market; in Europe, CCS2 is the standard, AFIR sets coverage rules, and IONITY competes with energy companies and Tesla; in China, State Grid, TELD, and Star Charge run large networks alongside automaker networks and NIO's swap stations, under China's GB/T standard.[10][7][6]

Consensus Link
  • 1NACS / SAE J3400
  • 2Tesla access, IONNA
  • 3NEVI funding
  • 1CCS2 standard
  • 2AFIR coverage rules
  • 3IONITY, Tesla, energy firms
  • 1GB/T standard
  • 2State Grid, TELD, Star Charge
  • 3NIO battery swap
  • 1CHAdeMO legacy (Japan)
  • 2Early-stage networks (India)
How automaker charging strategies differ by region.
09
Live · coming next

Pulse

What's happening with oems (automakers) and ev charging networks

Every headline, story, and sentiment shift about oems (automakers) and ev charging networks: updated continuously, tagged to the map, and linked back to how it works.

Footnotes

Sources

  1. 1IONITY , IONITY GmbH
  2. 2IONNA , IONNA LLC
  3. 3Tesla Supercharger , Tesla
  4. 4Electrify America , Electrify America
  5. 5Volkswagen clean air act civil settlement , US Environmental Protection Agency
  6. 6NIO (Power Swap) , NIO
  7. 7SAE International (J3400 North American Charging Standard) , SAE International
  8. 8Hubject , Hubject GmbH
  9. 9National Electric Vehicle Infrastructure (NEVI) Formula Program , US Federal Highway Administration